Jump to content

Recommended Posts

Posted

I fish clear water, normally 10 or more feet of clarity so I tie long fluoro leaders on my casting setups. I was thinking about get a daiwa tatula ct, but I’m wondering if the t-wing system would catch my leader knot ( I tie a FG). Should I not get the daiwa ( or get a fuego)? Should I tie shorter leaders? Or will the t-wing be fine? 

  • Like 1
  • Super User
Posted

T-Wing will handle the knot better than a standard round or oval aperture.

  • Like 1
  • Super User
Posted
8 minutes ago, August said:

I was thinking about get a daiwa tatula ct, but I’m wondering if the t-wing system would catch my leader knot ( I tie a FG).

Depending on your line's diameter, it might catch sometimes when reeling it in, but not to a dead stop especially with a FG. Might as well get a Fuego if you're concerned as it's the same reel as the CT other than the line guide.

  • Like 2
Posted
30 minutes ago, PhishLI said:

Might as well get a Fuego if you're concerned as it's the same reel as the CT other than the line guide.

And it’s cheaper too. But how much casting distance would I gain from the t-wing?

  • Super User
Posted
2 minutes ago, August said:

But how much casting distance would I gain from the t-wing?

IMO, the T-wing's only really a factor when using plastic lines greater than typical 17lb test. With braid, no meaningful difference.

  • Like 1
  • Super User
Posted
10 minutes ago, August said:

And it’s cheaper too. But how much casting distance would I gain from the t-wing?

My experience replacing a Fuego CT with a Tatula CT on the same rod loading the same line....maybe 5%...so 7'-8' more on a 50 yard cast (which is a long cast in my book).

  • Like 2
Posted

@August For the future, fg knots are the only way to deal with the TWS on diawa and make it a viable option.  Like @PhishLI it can sometimes catch while reeling it in, but I've only found that to happen on my tat 200 w/ 65lb pp to 20lb mono.  The TWS w/lighter braids and leaders has yet to hiccup for me.  The tat300 with the same line combo as the 200 is as smooth as the lighter setups.  With what you're looking at buying, I think the CT is a great choice.

 

scott

  • Like 1

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Unfortunately, your content contains terms that we do not allow. Please edit your content to remove the highlighted words below.
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.


  • Outboard Engine

    Fishing lures

    fishing forum

    fishing forum

    fishing forum

    fishing tackle

    fishing

    fishing

    fishing

    bass fish

    fish for bass





×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.